Clients and Projects |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Between the period 1998 to 2006, ST&L Limited have carried out Risk Assessments, Machinery Safety Consultancy and Safety System Installation Projects for the following Clients:
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
At Allied Distillers Limited at Dumbarton, we have been contracted to carry out site-wide machinery risk assessments as well as reviewing and inspecting their new machine purchases to ensure that they comply with the Supply of Machinery (Safety) Regulations 1992. At Allied Distillers Limited, we have been contracted by McArthur Electrical to design upgraded safety systems for ten cranes in their Bulk Glass and PAD areas. The contract requires the production of new electrical safety system designs and specification of lightguards, mechanical interlocks and other safety components. General safety consultancy is also provided for the client. At Allied Distillers Limited, we have been contracted by McArthur Electrical to design upgraded safety systems for machines in their palletising and malt cask intake areas. The contract requires the production of new electrical safety system designs and specification of lightguards, mechanical interlocks and other safety components. General safety consultancy is also provided for the client. At Allied Distillers Limited at Dumbarton, we have been contracted to carry out a Risk Assessment and PUWER audit of one of their filling machines and then to carry out a full mechanical and electrical safety upgrade of the machine. At Allied Distillers Limited, we have been contracted by McArthur Electrical to design upgraded safety systems for machines in their PAD Case Clamps & Pallet Stacker. The contract requires the production of new electrical safety system designs and specification of lightguards, mechanical interlocks and other safety components. General safety consultancy is also provided for the client. At Bacardi Martini Limited at Southampton, we have been contracted to carry out Risk Assessments and a PUWER/EHSR Audit of 15 machines on their A & Z Carbonate Lines. We have also been contracted to carry out Risk Assessments of their Process Areas. At Bacardi Martini Limited at Southampton, we have been contracted to carry out Risk Assessments and a PUWER/EHSR Audit of 42 machines on their regular Production Lines. At Bacardi Martini Limited at Southampton, we have been contracted to carry out Risk Assessments and a PUWER Audit of their regular Process Areas At Bacardi Martini Limited at Southampton, we have been contacted to carry out Manual Handling Assessments on their two Carbonate Lines. At Bacardi Martini Limited at Southampton, we have been contracted to carry out a safety upgrade of four palletisers and depalletisers machine safety circuits. At Bacardi Martini Limited at Southampton, we have been contracted to carry out a safety upgrade of one palletiser and one depalletiser machine safety circuits. At Bacardi Martini Limited at Southampton, we have been contracted to carry out production of a Permit To Work System and carry out training courses for all of their engineering personnel. At Bacardi Martini Limited at Southampton, we have been contracted to carry out a safety upgrade of two fillers and two stretchwrappers machine safety circuits. At Best Foods Limited, the machinery on three production lines have been upgraded, based on the recommendations made by our Risk Assessments. We have been responsible for all of the machinery safety circuit design, project management, electrical and mechanical installation, testing and certification and general machinery safety advice.
At Butchers Petcare in Crick, we have been contracted to carry out a detailed Risk Assessment and PUWER 98 Audit of some of their production/process work equipment.
For Cermex Ltd we have carried out production of a Lifting Equipment Checklist for CE Marking
At Coca Cola Enterprises at East Kilbride, we have been contracted to upgrade five machines on a bottling line to meet the requirements of their own G4 safety specification. The contract involves the design and installation of new electrical safety systems and lightguards. At Coca Cola Enterprises Limited at East Kilbride, we have been contracted to replace several redundant lightguard systems with new installations. At Coca Cola Enterprises at East Kilbride, we have been contracted to carry out Risk Assessments and PUWER Audits of 30 machines on their Production Lines. At Coca Cola Enterprises at East Kilbride, we have been contracted to install seven lightguard systems on some of their palletisers and depalletisers and to carry out a safety upgrade of the machine safety circuits. At Coca Cola Enterprises at Edmonton, we have been contracted to carry out a safety upgrade of the electrical safety systems on two palletisers and two stretchwrappers to meet the requirements of their own G4 safety specification. The contract involves the design and installation of new electrical safety systems. At Coca Cola Enterprises at Edmonton, we have been contracted to carry out machinery risk assessments on all five of their production lines, as well as reviewing and inspecting their new machine purchases to ensure that they comply with the Supply of Machinery (Safety) Regulations 1992. At Coca Cola Enterprises at Edmonton, we have been contacted to carry out a safety upgrade of 3 of their Krupp Blowmoulding machines. At Coca Cola Enterprises at Edmonton, we have been contracted to carry out a risk assessment of one of their case divider machines and subsequently carry out a safety upgrade of the electrical system. At Coca Cola Enterprises at Edmonton, we have been contracted to carry out a full electrical safety system upgrade on one of their blowmoulding machines. At Coca Cola Enterprises at Edmonton, Milton Keynes, Sidcup and Wakefield we have been contracted to carry out a safety upgrade of four packaging machine safety circuits and fitting of solenoid-locking safety switches. At Coca Cola Enterprises at Edmonton, we have been contracted to carry out a Risk Assessment and PUWER 98 Assessment of their new line 4 bottling line. At Coca Cola Enterprises at Edmonton, we have been contracted to carry out replacement of safety switches on their Krupp B111 Blowmoulder. The work includes major safety circuit modification and improvement, to ST&L designs. At Coca Cola Enterprises Limited at Edmonton and Milton Keynes, we have been contracted to carry out various machine risk assessments and safety system testing and verification to the requirements of The Provision and Use of Work Equipment Regulations 1998 (PUWER), The Supply of Machinery Regulations 1992 and CCE’s own G4 safety specification. At Coca Cola Enterprises at Milton Keynes, we have been contracted to carry out a Risk Assessment and PUWER 98 Assessment of their new ‘Bag-in-the-Box’ line. At Coca Cola Enterprises at Sidcup, we have been contracted to carry out Risk Assessments and PUWER Audits on their new Line 4 Production Line. At Coca Cola Enterprises at Sidcup, we have been contracted to replace a number of redundant lightguards with new Smartscan 8000 series lightguards. The work includes major safety circuit modification and improvement, to ST&L designs. At Coca Cola Enterprises at Sidcup, we have been contracted to carry out a Risk Assessment and PUWER 98 Audit of their new Process Area Complex. At Coca Cola Enterprises at Wakefield, we have been contracted to design, produce and present a Machinery Safety Training Course, training CCE staff in their own G4 Safety Standard. At Coca Cola Enterprises at Wakefield, we have been contracted to carry out Risk Assessments and PUWER Audits on their 3, 4, 5 & 6 Production Lines. At Coca Cola Enterprises at Wakefield, we have been contracted to carry out a review and rewrite of their own PE-001.S84 safety standard with the addition of ST&L designed safety circuits to demonstrate ‘best practise’ for their machine suppliers and installers. At Debden Securities Limited at Loughton, we have been contacted to carry out a detailed Risk Assessment and PUWER 98 Audit of their Cutpak packaging machine.
For Deejay Machine Services in Hedingham, we have carried out production of Electrical Schematic Drawings and Control Panel Design for a new Palletising System At Delphi Diesel Systems at Sudbury, we have been contracted to carry out lightguard and safety system testing and verification work on their entire site. At Diageo Packaging at Runcorn (formally Guinness), we have been contacted to carry out a full PUWER 98 Audit of their 4 bottling and canning production lines. At Diageo in Belfast, we carried out a detailed Risk Assessment and PUWER 98 Safety Audit of their Bottling & Canning Lines
At Nestle Purina in Wisbech, we have been contracted to carry out a detailed Risk Assessment and EHSR Audit of some of their production/process work equipment and to CE Mark the completed process At Friskies Petcare (UK) Limited at Wisbech, we have been contracted to carry out Risk Assessments and PUWER Audits of one of their packaging lines. For GDR Associates Limited in Mildenhall, we have carried out Testing and Certification of Lightguard Systems for Delphi Diesel Systems of Sudbury.
At Geberit at Aylesford, we have carried out general machinery safety and PUWER 98 Consultancy At Glaxo Smithkline Limited at Harlow, we have been contracted to carry out a range of risk assessment and safety-related projects over a two-month period. This contract includes; Risk assessment of existing and new machines to the requirements of the PUWER Regulations (some 140 machines in all). At Guinness Packaging Limited, we have been responsible for carrying out site-wide Machinery Risk Assessments on their four Production Lines at the Runcorn site. The recommendations made by our Risk Assessments have been used to provide quotations to carry out the work and £200K ‘capex’ has been raised for the project. ST&L Limited have also provided quotations to carry out the work and Project Management and, at time of writing, we have already received orders to upgrade some of the machines totalling £30K. The next stage of the upgrades is about to begin, at a value of £55K. At Guinness Packaging Limited at Runcorn, we have completed the mechanical & electrical refurbishment of a Steinle Depalletising System, complete with new control panel and PLC software. The Depalletiser was refurbished at our workshops, installed and commissioned by our engineers on site, and supplied with full CE certification and manuals etc. At Hamlin Electronics Limited, the machinery on three production lines has been upgraded, based on the recommendations made by our Risk Assessments. The work is being carried out by other contractors. At Hanson Building Projects in Thurrock, we carried out a Safety System Feasibility Study, Specification and Design for their Cake Bogie Area. The project involved a detailed investigation into the safety systems installed and the production of a comprehensive Machinery Technical File for the safety system upgrade of the area
At IBC Vehicles at Luton, we have been contacted to install Fortress mechanical interlocks to their paint-shop area access doors. For James Scott, we have been responsible for all of the machinery safety circuit design, project management, testing and certification and general machinery safety advice for the electrical content of the Safety Upgrade Work at Allied Distillers Limited. For Krones UK Limited, we have been contracted to produce full CE Marking documentation to enable them to apply the CE Mark to a complete bottling line they have supplied for Allied Distillers Limited at Dumbarton. For Krones UK Limited, we have been contracted to produce full CE Marking documentation to enable them to apply the CE Mark to a complete bottling line they have supplied for Coca Cola Enterprises at East Kilbride.
For MDA Electrical Services Limited we have carried out electrical CAD designs for a swimming pool pumping system at Brightlingsea
At Nestle U.K. Limited at Hayes, we have modified one of their Depalletisers to utilise the new 1120 x 1300 mm pallet size. A new hoist well was constructed for the machine at our workshops and was installed, together with all electrical, control panel and associated software modifications. We also carried out a Risk Assessment and PUWER Audit of the machine and received a variation order to carry out a Safety Upgrade of the machine. As a follow on to the above project, we have designed, manufactured and installed a pallet roller conveyor system for the above Depalletiser. The project involved the manufacture of a new control panel and PLC software. At Nestle UK Limited at Tutbury, we have been contracted to carry out a PUWER and CE Marking Training Course for their project engineering department, to enable them to recognise the safety requirements for new and existing machinery. This course is now being offered to all of our clients (please see our brochure for further details). At Nexfor Limited, we have been contracted to carry out a detailed Risk Assessment and PUWER 98 Audit of much of their production/process work equipment. At PPG Industries at Stowmarket, we have been contracted to carry out Risk assessments and PUWER 98 safety audits of their interlocked work equipment. We have also provided general machinery safety consultancy to the client.
At PremierFoods in Lifton, we carried out a detailed Smartscan Light curtain Service on six of their palletiser and palletiser/depalletiser machines
At Romglobe Limited in Luton, we carried out a Risk Assessment and PUWER 98 Safety Audits of Cask Washer & Associated Conveyor System
At Scottish Courage Brewing Limited at Reading, we have been contracted to carry out Risk Assessments and a PUWER Audit of 17 machines on their B1 Bottling Line. At Scottish Courage Brewing Limited at Reading, we have been contracted to carry out a range of electrical and mechanical modifications to their B1 Bottling Line to aid in achieving compliance with The Provision and Use of Work Equipment Regulations 1998 (PUWER). The scope of works is that defined in our initial Risk Assessments of the line and includes machinery guarding modifications, electrical safety circuit upgrades to EN 954 and labelling/safety sign installation.
For SDS Ltd we have carried out production of electrical schematic safety system drawings for a lightguard system installation at Coca Cola Enterprises at Sidcup
At Smithkline Beecham Limited in Coleford, the machinery on two production lines has been upgraded, based on the recommendations made by our Risk Assessments. We were responsible for all of the machinery safety circuit design, project management, electrical and mechanical installation, testing and certification and general machinery safety advice. At Smithkline Beecham Ltd in Coleford, we have been contracted to carry out Risk Assessments of Depalletisers and Palletisers (and Stretchwrappers) to The Provision and Use of Work Equipment Regulations 1998 (PUWER) For Sonic Air Systems in South Shields, we have carried out production of an updated Certificate of Conformity for one of their Air Knife Systems
At Steel & Alloy Processing Limited, we have been contacted to carry out a detailed Risk Assessment and PUWER 98 Audit of their winding/slitting machine. At Steel & Alloy Processing Limited in West Bromwich, we have been contacted to carry out a detailed Risk Assessment and PUWER 98 Audit of their winding/slitting & press machines.
At Tamarfoods at Callington, we have been contracted to carry out Risk Assessments and a PUWER Audit of their process, baking and packaging machines. For Tebutt Projects we carried out a safety survey of a Dan conveyer system, for Coca Cola, Edmonton At Unilever Best Foods Limited (formally Van den Bergh Foods Limited) at Needham Market, we have been contracted to carry out a risk assessment and PUWER Audit of one of their Pot Filling Machines. At Unilever Best Foods in Needham Market, we have carried out a HAZOP Study, Risk Assessment and PUWER 98 Safety Audit of their Ammonia Plant At Unilever Best Foods in Needham Market, we have carried out a Risk Assessment and PUWER 98 Safety Audit of Mariani Palletiser Pack Infeed Conveyors, Palletiser and Stretchwrapper At Unilever Best Foods in Crumlin, we have carried out an audit of a Certificate of Conformity on one of their new weighing machines
At Weetabix Limited at Kettering, we have been contracted to carry out risk assessments, PUWER audits and Essential Health & Safety Requirement (EHSRs) audits on a range of their new process machinery. Should references be required for any of the above projects, please do not hesitate to contact us and we will arrange them and, if required, site visits can be arranged to view completed work. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||